In this section you will be able to view the start to finish of various projects that American Contractors has done in the past.

This first project is a septic tank installation that was done in September/October of 2002. The pictures shown here give you a visual on how professional and responsible American Contractors are while performing a project.

Septic System Installation- 2002

Digging the pit-1
Digging the pit-1
Filling the dump truck with dirt
Filling the dump truck with dirt
Digging the pit-2
Digging the pit-2
Filling the dump truck with dirt-2
Filling the dump truck with dirt-2
Filling the dump truck with dirt-3
Filling the dump truck with dirt-3

Dump truck leaving to dispose
Dump truck leaving to dispose

Track Hoe
Track Hoe
Septic hole-1
Septic hole-1
Septic hole-2
Septic hole-2
Backfill with layer of sand
Backfill with layer of sand
Sand then is smoothed out
Sand then is smoothed out
Final sand grade
Final sand grade
Final sand grade and haul off
Final sand grade and haul off
Dump truck load of stone laid down
Dump truck load of stone laid down
Contracter sheeting rolled out
Contracter sheeting rolled out
Septic piping is run from the house
Septic piping is run from the house
Ground is covered over with dirt and grass seed
Ground is covered over with dirt and grass seed
Ground is covered over with dirt and grass seed-2
Ground is covered over with dirt and grass seed-2